![[Translate to Englisch (Nordamerika):] Servoplan E 600](/fileadmin/_processed_/1/7/csm_K_ServoplanE600_S_c34802724e.png)


Servoplan E 600
Fast-Setting, Flowable Screed
- Self-leveling, pumpable, and polymer-modified
- Quick-setting and drying – ready for tiles in approximately 3 hours (bonded)
- Supports layer thicknesses from 5–80 mm in bonded applications
- Suitable for underfloor heating, including low-profile systems
- EC 1Plus certified – for very low emissions and excellent indoor air quality
- DGNB Navigator listed – supporting sustainable building standards
Servoplan E 600 is a cement-bound, polymer-modified, fast-setting flowing screed mortar in accordance with DIN EN 13813, strength class CT-C40-F7. It is designed for producing:
- Bonded screeds (directly applied to the substrate using a primer)
- Floating screeds installed over insulating or separating layers
- Heated screeds applied over insulation systems (including underfloor heating)
Recommended Coverings
Servoplan E 600 serves as a highly stable substrate for:
- Ceramic tiles, natural stone, and artificial stone
- Textile and resilient floor coverings
- Parquet flooring (with appropriate surface sealing and moisture testing)
Designed for use in dry, interior areas, it must be installed over rigid, load-bearing, and dimensionally stable substrates.
It is also compliant with DIN 18534 moisture exposure classes W0-I and W1-I, when paired with appropriate waterproofing systems.
Key Feature
- Ready for ceramic tile installation in as little as 3 hours
- High coverage – up to 56 ft² per 20 kg bag at 1 mm thickness
- Ideal for private bathrooms, heated screeds, and commercial installations
- Classified Fire Class A1fl according to DIN EN 13501-1
Substrates must be prepared according to applicable standards: DIN 18353, DIN 18560, and the BEB data sheet “Assessment and Preparation of Substrates.”
Ensure substrates are:
- Clean, dry, dimensionally stable, and free from adhesion-reducing substances
- Ensure substrates are sufficiently protected against moisture migration from below
- Primed appropriately with Kiesel products such as: Okatmos® DSG, EG 20, UG 30, Okapox GF, or Okamul PU-V schnell
When installing over separating or insulation layers, apply a 2-layer separating foil per DIN 18560-4.
- Mixing: Add approx. 3.2–3.4 liters of clean water per 20 kg bag. Mix thoroughly at a maximum of 600 RPM until smooth and lump-free.
- Slake Time: Allow the mixture to rest briefly, then remix before application.
- Application: Pour and spread evenly to the desired height. Finish the surface using a buffing rod or trowel for a level result.
- Pump Application: Suitable for use with duo-mix pumping systems, such as M-Tec or Putzmeister, for large-area installation.
- Curing Conditions: Protect freshly applied screed from drafts, direct sunlight, and high ambient heat for at least 24 hours to ensure optimal curing.
Installation Timelines
| Covering Type | Installation Time |
| Ceramic tiles | After approx. 3 hours (Bonded installation) |
| Natural stone | After approx. 24 hours (at 10 mm thickness) |
| Resilient/textile coverings | After approx. 24 hrs (10 mm), ~48 hrs (20 mm), ~72 hrs (>20 mm) |
| Hardwood | After approx. 72 hours (after CM/KRL moisture test) |
General guidelines for underfloor heating (detailed description in our “OkaQuiet manual”, page 18):
- The underfloor heating system should be installed according to the supplier‘s instructions. An incorrectly installed underfloor heating system can cause the screed to become unfastened or the floor covering to lose shape.
- Damage to the floor or the underfloor heating pipes resulting from incorrect installation and causing the finish layers to show incomplete covering is beyond the liability of the installer of the floor and his suppliers.
- After applying the screed, wait for a minimum of 28 days, then gradually heat up the underfloor heating system by a maximum of 5° C / 41° F per day.
- Next, ensure the underfloor heating system is switched on uninterruptedly for 14 days so that the floor can be set and any residual moisture can quickly evaporate.
- Switch off the heating system at least 24 hours before levelling/applying floor covering.
- Switch on the heating system at least 24 hours after levelling/applying a floor covering and gradually raise the water temperature by a maximum of 5° C / 41° F per day. Concrete Core Activation
Color
Grey
Application
Interior, floors only
Water demand
Approx. 3.2 - 3.4 l per 20 kg bag
Thickness
- 5–80 mm (bonded)
- 30–80 mm (floating)
- 35 mm (heated screeds)
Processing time*
Approx. 60 minutes
Ready for traffic*
After approx. 3 hours (bonded installations)
Fire classification
A1fl according to DIN EN 13501-1
EMICODE®
EC1Plus – Very low emissions (GEV certified)
ZP 1 – Low-chromate (TRGS 613)
0,0 g/L
Approx. 6 months (Climate-controlled, unopened packaging)
suitable (see advices above)
Functional-heating protocol (heated screeds):
- Earliest start: ≥ 24 h after placement.
- 25 °C flow – hold 3 days.
- 55 °C flow – hold 4 days (max. permitted).
- Reduce to surface ≥ 15 °C – ≈ 20 °C (choose upper end for resilient floors) and keep until moisture ≤ 2.5 CM-%.
- Document all steps per DIN EN 1264-4.
*
At 68 °F (+20 °C) and 65 % relative humidity. Higher temperature and low humidity decrease, lower temperature and high humidity in-crease this value respectively.
Higher water ratio, as well as poor construction climate, can cause higher shrinkage behaviour and/or will resolve in cracks or additional problems.
The walkability times given are dependent on the construction-climatic conditions and the applied thicknesses and thus serve as reference values.
Because mineral materials will physically interact with the surrounding, the surface area is immediately to prove after reaching the maturity and shall be documented. Use only batches from the same material.
| Thickness (mm) | Approx. Coverage (ft² per 20 kg bag) |
| 5 mm | 22.4 ft² |
| 10 mm | 11.2 ft² |
| 20 mm | 5.6 ft² |
| 40 mm | 2.8 ft² |
Consumption rate: ~1.8 kg/m² per mm thickness.
- Clean tools and machinery immediately after use with water.
- During interruptions, clean pumps and hoses promptly.
| Description | Item No. | |
|---|---|---|
| 54 x 20 kg/ 44 lbs paper bags | 42053 | 4015705420530 |
The aforementioned information, especially the proposals for processing and utilizing our product, is based on our knowledge and experience. We recommend that you carry out your own tests in every case to ensure the suitability of our products for the intended process and processing purposes because of the different materials and the working conditions which lie beyond our area of influence. No liability can be derived from this advice or from verbal advice, unless we are responsible for (criminal) intent or gross negligence in this respect.
Coverage calculator imperial
Coverage calculator metric
Calculate quickly and easily